The FIRST N2 CRYOGENIC plant start up

Commissioning and start-up activities have been completed; the first Sinergia Air Separation Plant is definitively under operation

This project started in 2019 when Sinergia decided to extend its expertise to the design and construction of cryogenic air separation technology suitable for the production of nitrogen and oxygen in gaseous and liquid status. The strategy was to integrate with cryogenic the portfolio of N2 generation technologies, already including PSA and membranes for many years, to give a positive answer to the client’s demand.

By participating in a governmental tender, Sinergia decided to take on this challenge, in a joint venture with IGC, a local company specialized in civil construction.
A dedicated department, inclusive of all the necessary competencies was created within the company. Technical and commercial people are devoted to the common goal of satisfying all project specifications fixed by South Refinery Company, the largest refinery in Iraq.

The harsh climatic conditions and the complexity of engineering have been easily handled thanks to the long-lasting experience in designing engineered Instrument Air and N2 Generation Packages for M.E. Countries.

The long time it took from the P.O. to the commissioning was mainly caused by bureaucratic and procedural issues. We knew these were part of the challenge!

1) Gaseous Nitrogen production (GAN)

Parameter Description U.M. Expected value from the client Average value (On Site) Test
GAN Flowrate Nm3/h 450 ≥ 450
GAN Pressure bar(g) 7 7
O2 concentration in GAN ppm Ovol 5 0,5
Consumption kW 663 519,4

2) Gaseous and liquid Nitrogen (GAN & LIN)

Parameter Description U.M. Expected value from the client Average value (On Site) Test
GAN Flowrate Nm3/h 300 ≥ 300
GAN Pressure bar(g) 7 7
O2 concentration in GAN ppm Ovol 5 0,5
LIN Flowrate % ΔL/h 0,4174 ≥ 0,4174
LIN Flowrate Nm3/h 150 ≥ 150
LIN Pressure bar(g) 7 7
O2 concentration in LIN ppm Ovol 5 0,5
Consumption kW 663 517,6

A small capacity but highly engineered project has been finally started, in record time, with great satisfaction of all people involved. Now, under the remote assistance, service performed by Sinergia technicians, the client is comfortably supported in the early operation phase.

During the detailed engineering phase, SRC had the chance to appreciate the assigned team and this with such an increasing interest and hype, so as to choose Sinergia for another N2 cryogenic plant, that will be installed in a close area.

 

 

We are ready to satisfy your specific requests too!

 